Sheng Da Silicon Mining Factory, located in WenChuan, Sichuan province,
been set up 2 sets of 6300KVA melting furnaces with production capability
of 700 ton per month.
Zhong Xing Silicon Mining Factory, located in LeShan, Sichuan province,
been set up 2 sets of 6300KVA melting furnaces with production capability
of 700 ton per month.
Xing Huang Silicon Mining Factory, located in HuNan Province, been
set up 2 sets of 6300KVA melting furnaces with production capability
of 700 ton per month.
Hai La Er Silicon Mining Factory, located in Inner Mongolia, been
set up 12 sets of 6300KVA melting furnaces with production capability
of 4000 ton per month.
Hua Pin Silicon Mining Factory, located in YunNan province, been
set up 6 sets of 6300KVA melting furnaces with production capability
of 2000 ton per month.
The following projects are under construction.
Kinglia Maerkang Silicon Mining Factory, located in Maerkang, will
be set up 1 set of 6300KVA melting furnaces. The electricity provide
by water power station.
Kinglia Yanjing Silicon Mining Factory, located in Yanjing, will
be set up 1 set of 6300KVA melting furnaces. The electricity provide
by water power station.
Jinchuan water power station.
|